Welded or clamped? The Council of State refuses to rule on the Albert Canal screw pumps under extreme urgency — the EUR 17 million award to Fabricom-Hye stands
The temporary association Roegiers-Egemin challenged the award of the pumping stations and hydropower plants at the Ham and Olen locks to Fabricom-Hye on the ground that the latter would clamp the casing of the fourth screw pump instead of welding it, as the specifications required, but the Council of State held that such a technical plea is serious under extreme urgency only if it is convincing at first sight, which was not the case, and that the criticism of the scores was either unconvincing prima facie or, where it seemed to have some basis, would not have changed the ranking.
What happened?
De Scheepvaart wanted to install pumps at the push-tow locks of the Albert Canal in Olen and Ham/Kwaadmechelen to pump water from the lower to the upper reach in dry periods and to generate green electricity as turbines for the rest of the year. The contract — design and construction of screw-pump stations, a service building, a bypass channel, quay walls and roadworks — was advertised at European level on 21 January 2010 and in the Belgian Bulletin of Tenders on 22 January 2010, followed by five corrigenda. It was divided into three sub-contracts (supply of screw pumps for Ham, works at Ham, works at Olen). The award criteria were price (40), technical value of the design and quality of the structural study (30), quality of measuring equipment, materials and products (20) and project organisation and staff (10). Variants were allowed on certain points. Seven tenders were opened on 24 March 2010. The external control body SECO compared the foundations on 31 May 2010; on 21 June 2010 the evaluation committee found all tenders regular and ranked variant 4 of Fabricom-Hye first with 87.21 points. Roegiers-Egemin’s base tender came sixth with 83.90 points. On 24 June 2010 De Scheepvaart awarded the contract to Fabricom-Hye for EUR 17,063,847.29 including VAT (EUR 14,102,353.14 excluding VAT). Roegiers-Egemin sought suspension under extreme urgency on 9 July 2010; Fabricom-Hye intervened. In a first plea Roegiers-Egemin argued that Fabricom-Hye’s tender was substantially irregular: for the fourth screw pump at Ham, an ‘enclosed screw with rotating casing’, the specifications provided that ‘the metal casing is continuously welded to the blades over the full length of the screw’, whereas Fabricom-Hye would merely clamp the casing — a cheaper method, they said, with risks of leaks, wear and loss of efficiency, which had moreover earned extra points under the third criterion (7 against 5 out of 10). De Scheepvaart and Fabricom-Hye replied that a corrigendum of 24/25 February 2010 had amended the clause on the lower bearing, allowing a design with a central load-bearing tube, with the blades welded to that tube over its full length. The Council, through State Councillor Peter Sourbron as acting president, first set out the distinction between substantial irregularity (departure from an essential clause: the tender must be excluded) and relative irregularity (the authority may choose). But whether the corrigendum permitted a central tube, whether the blades then had to be welded to the tube or to the casing, and whether that offered the same guarantees, required a technical assessment. Such a technical plea can lead to suspension under extreme urgency only if its seriousness is apparent from a rapid prima facie examination, and the Council expressly left open whether it would even consider itself competent to rule on it without expert advice. The plea was not serious; the complaint about reasons also failed, since the detailed petition itself showed that the applicants understood the reasons. In a second plea the applicants challenged six of the fourteen sub-criteria of the second criterion (they scored 21.73 out of 30, Fabricom-Hye 24.83) and their score on the third. The Council first rejected the objection that the plea was inadmissible because it relied on a tender filed as entirely confidential: the Council had the full tender and could verify the passages quoted. It then went through the sub-criteria. Where the applicants referred to the English-language Eurocode 2 or an AOSO document without explaining its relevance, the Council could draw no conclusions without an expert; assertions about concrete cover were unsubstantiated; and for several sub-criteria even the maximum score, or the same score as Fabricom-Hye, would not have reversed the ranking, so the applicants prima facie had no interest in that criticism. The Council gave weight to the fact that the assessment was made by a committee of eight sector specialists after an evaluation by SECO. The second plea was not serious either. The application was dismissed; Roegiers and Egemin each bear half of EUR 350 in costs, Fabricom and Hye each half of the EUR 250 for their intervention.
Why does this matter?
This judgment exposes where the extreme-urgency procedure stops: at technology. The Council accepts the principle that a tender departing from an essential clause must be excluded, but refuses, in a procedure lasting a few days, to decide whether a clamped casing, or blades welded to a central tube, are technically equivalent to what the specifications required. Appointing an expert does not fit within extreme-urgency proceedings. Anyone seeking suspension of an award on the basis of a technical irregularity must therefore show it so that it is evident at first reading — which becomes particularly hard when the contracting authority and the successful bidder put forward a plausible reading of a corrigendum. The judgment is also a lesson in interest: challenging a score only makes sense if the correction could reverse the ranking. For a bidder ranked sixth, more than three points behind the winner, that is a high threshold. Finally, the Council clarifies two procedural points: a tender filed as entirely confidential does not automatically render a plea inadmissible, and a detailed petition undermines the complaint that the reasons were insufficient.
The lesson
For bidders: if your challenge rests on a technical departure from the specifications, make it as concrete and visible as possible — quote the clause and the passage from the competing tender side by side, and take account of every corrigendum, as they can shift the meaning of a clause. References to standards or technical documents without explaining their relevance do not persuade under extreme urgency. When criticising scores, always calculate whether the correction would actually put you first; otherwise you have no interest in the plea. And do not complain of inadequate reasons if your own petition shows you understood them perfectly. For contracting authorities: an assessment by an expert committee, supported by external technical control and recorded in a detailed report, is hard to attack in summary proceedings. Word requirements you regard as essential unambiguously, and use corrigenda with care: every change opens room for debate on what is still compliant.
Ask yourself
Can you make the technical departure you allege evident in a few sentences to a judge without a technical background? Have you checked every corrigendum for its impact on the clause you rely on? Have you calculated whether the scores you challenge would actually bring your tender to first place? Do you explain the relevance of every standard or technical document you cite? Have you considered filing a non-confidential version of your documents? And as a contracting authority: do your specifications make clear which technical requirements are essential, and have you checked whether a corrigendum has unintentionally relaxed them?
About this database
The Council of State (Raad van State / Conseil d'État) is Belgium's supreme administrative court. In disputes over public procurement — from contract awards to tenderer exclusions — the Council of State is the final arbiter. The rulings in this database are summarised by TenderWolf in plain language, with practical lessons for tenderers and contracting authorities. View all rulings →