Rejection Dutch-speaking chamber

Lowest fee, but too little vision: architect Bart Tryhou loses the Melle police building — and the Council of State explains why ‘inspiring’ is not the same as ‘enthusiastic’

Ruling nr. 206908 · 13 August 2010 · XIIe vakantiekamer

Ir.-Architect Bart Tryhou bvba had offered the lowest fee for designing the new police building in Melle, but lost on ‘vision’ (25 against 36 out of 40) to Architectenstudio bvba and sought suspension of the award on the ground that the police zone had not separately weighted sub-criteria and had taken extraneous elements into account, but the Council of State held that the explanations attached to the criteria were not sub-criteria and that the assessment remained within the bounds of reasonableness.

What happened?

The Rhode & Schelde police zone wanted to build a new police building in Melle and sought a designer for architecture, structural engineering, technical installations and landscaping, through a negotiated procedure with publication. Six of the sixteen candidates met the selection criteria. They had to submit a tender by 7 June 2010 and present their approach and initial vision in person on 9 June 2010. The award criteria were: tender and quality of the tender file (5 points, explained as ‘completeness of the tender’ and ‘comments on the design contract’), the fee (30, using the formula p = 30 × lowest price / own price), composition and capacity of the firm or team, including the quality of the design and site project leaders (20), vision (40, with four aspects: brief, site and budget; ecological and sustainable building; design, concept and architectural quality; ease of maintenance and manageability) and quality procedures and budget control (5). Four firms submitted tenders. Tryhou was the cheapest and received the full 30 points for the fee, but only 25 out of 40 for vision. Architectenstudio Multiprofessionele Architectenvennootschap bvba scored 21.20 on the fee but 36 on vision and came first with 84.2 points, ahead of Architectenbureau Van Acker & Partners (81.71), Tryhou (79.5) and Beel & Achtergael Architecten (74.2). The police board awarded the contract to Architectenstudio on 30 June 2010. Tryhou sought suspension under extreme urgency on 26 July 2010; Architectenstudio intervened. In a single plea Tryhou raised four complaints. First, the police zone had not assessed and weighted the sub-criteria separately, but had given only an overall assessment per criterion. State Councillor Johan Lust, acting president, began by stating that an award criterion or sub-criterion is a yardstick against which every tender must be expressly measured. But not every specification attached to a criterion is a sub-criterion: sometimes it is merely an explanation, intended precisely to clarify the scope of the criterion. That was the case here: the statement that the zone would welcome comments on the design contract, and the four aspects of ‘vision’, were not sub-criteria, and the third criterion covered the team and project leaders as a whole. Without sub-criteria there was no need for separate assessment or weighting. Second, the zone had allegedly taken account of unannounced elements: a print ‘in colour and in house style’, an inspiring presentation, staff CVs and the firm’s equipment. The Council disagreed. All tender files received at least 4.5 out of 5; two firms received an extra half point because the designer’s own house style was clearly visible in the file, not because it was printed in colour. CVs and equipment are relevant to the composition and capacity of a team. And the zone had not said that Tryhou was less enthusiastic, but that his presentation was less inspiring: ‘Inspiring enthusiasm is not a matter of being enthusiastic oneself, but of making others enthusiastic.’ Third, according to Tryhou, reasons were lacking for the fifth criterion; but three of the four bidders received 4 out of 5 for ‘clear procedures’ and the fourth received 5 because it had also attached its standard documents. Fourth, Tryhou challenged the substantive assessment. His ‘concession’ that the balance of the fee would be invoiced only after provisional acceptance already followed, in principle, from the design contract. That his design and site project leader were the same person was noted favourably by the zone, but the winner’s project leaders also made a ‘very good impression’. The alleged contradictions in the assessment of his vision were not contradictions: the passages Tryhou quoted summarised his own tender, not the zone’s judgment. The criticism that the waiting area in the transparent entrance offered little discretion (‘only half a box (rather a fixed screen)’), that a basement car park is expensive on a large site, and that the targeted E60 energy level was uncertain since Tryhou himself made it dependent on ‘the profitability of the concepts’ and the budget, was supported by the file. The zone had indeed noted that the winner proposed only an E100 level, observing that with some adjustments a better level could be achieved within the same budget. The plea was not serious; the Council left admissibility open and dismissed the application. Architectenstudio bears the costs of its intervention, EUR 125.

Why does this matter?

In architectural design contracts the vision often weighs more than the fee, and this judgment shows how hard it is to overturn such a qualitative assessment in summary proceedings. The main legal point is the distinction between a sub-criterion and an explanation of a criterion. A sub-criterion must be assessed separately and, where required, weighted; an explanation that merely clarifies the scope of a criterion need not. Anyone arguing that the authority failed to assess sub-criteria separately must therefore first show that they are genuine sub-criteria. The judgment also shows that the Council allows a broad connection between a criterion and the elements the authority considers under it: CVs and equipment belong to a team’s capacity, and the way a designer presents the team may count where bidders had to present their approach in person. Finally, a lesson in reading: an award report that first summarises the tender and then assesses it is not contradictory merely because the summary sounds more positive than the verdict.

The lesson

For bidders: in an architectural contract a low fee does not buy victory when vision weighs 40 points; invest in a developed design, including the less spectacular parts such as circulation, landscaping and discretion at reception. Do not promise an energy performance that the same tender makes dependent on profitability and budget. Treat the personal presentation as part of the assessment: the point is to convince the client, not to show that you are motivated. And anyone challenging an award because sub-criteria were not weighted separately must first show that the specifications contained genuine sub-criteria. Read the award report carefully: what looks like a contradiction is often the difference between the summary of your tender and the judgment on it. For contracting authorities: make clear in the specifications whether lists under a criterion are explanations or sub-criteria to be scored separately, and justify the points for each tender concretely. A report that names the strengths and weaknesses of each design holds up in summary proceedings.

Ask yourself

Is the list under the award criterion you rely on a genuine sub-criterion, or does it merely clarify what the criterion is about? Have you re-read the passages you consider contradictory: do they reflect the authority’s judgment, or a summary of your own tender? Does your design offer a developed answer to every aspect of the vision, or only to the eye-catching ones? Is the ‘concession’ you highlight real, or does it already follow from the contract terms? And as a contracting authority: do bidders know from your specifications whether the aspects under a criterion will be scored separately, and can you show for each tender why one vision earns more points than another?

About this database

The Council of State (Raad van State / Conseil d'État) is Belgium's supreme administrative court. In disputes over public procurement — from contract awards to tenderer exclusions — the Council of State is the final arbiter. The rulings in this database are summarised by TenderWolf in plain language, with practical lessons for tenderers and contracting authorities. View all rulings →